Whitehall
April 2021
A basement finish project, with kitchenette, and full bath, needed to incorporate a single car garage within it.
The challenge here was to keep the ceiling as high as possible despite all the utility pipes, wires and ducts hanging below the floor system.
Full bathroom adjacent to the main living space...
Around the corner (looking toward the main living space/kitchen area) there is storage closets in the hallway...
We ran a grid system to hold sheetrock, which encapsulates the garage and fumes from the living space.
Related Projects
King George Loop3
This was a conversion of large closet off an existing mudroom (with entrance from garage) into a half bath with upgraded storage space.
April 2025
Windy Rush kitchen
Here we upgraded the kitchen in 45 days, including refinishing all first floors and full interior paint.
February 2025
Windstream Way 5
Full conversation of original master bathroom and the middle rear bedroom so that both are directly connected to each other.
December 2024