A small up arrow.

Wexwood

May 2021
This image is featured to show the result of modifying a half bath to add a full shower. Where the shower exists now used to be a finished book niche area on the opposite side of the wall in the living room.
These deep book nices were removed and the wall finished off smooth, sheetrock and trim repaired and painted.
These deep book nices were removed and the wall finished off smooth, sheetrock and trim repaired and painted.
The finished shower with tiled niche...
The finished shower with tiled niche...
And the finished vanity area with new light, full bathroom paint, new tile floor and trim.
And the finished vanity area with new light, full bathroom paint, new tile floor and trim.

Related Projects