Chris@CPRConstructionNC.com
919-729-7471
About Us
Our Services
Projects
Projects
All Projects
Attics
Basements
Bathrooms
Kitchens
Additions
Small Projects
Testimonials
Contact us
Thistle Briar
February 2024
We finished off the 2nd half of this basement add a full bathroom and separate wet bar area.
Previously empty space we converted to a full entertaining wetbar.
The space next to the wet bar area became a full bathroom with floating vanity, bidet toilet and open towel niche.
A view back through the exit door showing open towel niche and towel warmer appliance down below.
Related Projects
King George Loop3
This was a conversion of large closet off an existing mudroom (with entrance from garage) into a half bath with upgraded storage space.
April 2025
Windy Rush kitchen
Here we upgraded the kitchen in 45 days, including refinishing all first floors and full interior paint.
February 2025
Windstream Way 5
Full conversation of original master bathroom and the middle rear bedroom so that both are directly connected to each other.
December 2024