At the master bathroom (the first bathroom) we renovated all the spaces and finishes, including reversing the direction of the pocket door to the toilet room for easier access.
The old tub area now converted to shower and linen closet to match the vanity area.
Other features of the project...down the entrance hallway (from the bedroom, we reversed the pocket door (immediately to the right in the photo) and added a new door (also to right - photo center) to create a "His" closet where the old shower used to be.
We also heated the floors. What you see are the heating wire elements laid out and prepared for tiling...
Refinished the existing shelving and carpeting in the "Hers" closet...
And turned the toilet 90 degrees and minimized the toilet space so to increase the size of His closet...
A view looking back down the new hallway toward the master bedroom...His closet is first on the left, Hers on the right.
At the hall bath we replaced the floor, refinished the sheetrock, added new wood trim, and fully painted.