A small up arrow.

Cherokee

April 2021
Were hired to assist with a "flip". While we did the interior work, including full kitchen and all baths renovated, flooring, paint, electrical and plumbing fixtures changed out, others worked on the exterior.
Here is the wall separating kitchen from front dining room prior to removal...
Here is the wall separating kitchen from front dining room prior to removal...
The original kitchen area...
The original kitchen area...
Half bath next to kitchen...
Half bath next to kitchen...
Upstairs hall bath...
Upstairs hall bath...
Master bath...
Master bath...
Master shower area...
Master shower area...

Related Projects